Disposal objects: oily sludge, sludge, solid hazardous waste in the factory, liquid, waste gas
Disposal scale: 60t/d
Emission standard: GB18484-2014
Completion time: 2022, under hot commissioning and debugging
Process flow: Feeding system (SMP, hoist, waste spray gun)+rotary kiln+secondary combustion chamber+waste heat boiler+
SNCR+rapid cooling tower+dry deacidification+activated carbon injection+bag filter+wet deacidification+flue gas heater+chimney
Project features: This project is executed according to digital delivery standards. After applying the digital platform, during the construction phase,
Can assist in eliminating 10% -20% of material surplus consumption in orders, reducing the economic loss risk caused by project delays due to engineering changes by 20%; During the operation and maintenance phase, save 10% -15% of operational consumption; Save 4% -7% of operation and maintenance costs. The water sealed slag discharger in this project collects ash residue through one conveying system and transports it to the ash storage bin for storage. The fly ash from the boiler, quench tower, and bag filter is collected by one collection and conveying equipment and transported to the fly ash storage bin for storage. The ash residue and fly ash are regularly transported for processing.